This website only gives an historic overview of the Croxley Rail Link scheme, covering activity up to August 2015. Transport for London (TfL) is now responsible for taking forward and delivering this extension of the Metropolitan line to Watford Junction. Live information on the Croxley Rail Link project will be available from TfL from September 2015. If you have any questions, TfL can be contacted on 0343 222 2424.
Back
Volume 2 Cover Volume 2 Contents
FIGURE 2.1 FIGURE 4.1 FIGURE 4.2 FIGURE 4.3 FIGURE 5.1 FIGURE 6.1A FIGURE 6.1B FIGURE 6.1C FIGURE 6.2A FIGURE 6.2B FIGURE 6.2C FIGURE 6.3 FIGURE 6.4 FIGURE 6.5A FIGURE 6.5B FIGURE 6.6A FIGURE 6.6B FIGURE 6.6C FIGURE 6.6D FIGURE 6.6E FIGURE 6.6F FIGURE 6.7A FIGURE 6.7B FIGURE 8.1 FIGURE 8.2 FIGURE 8.3 FIGURE 8.4 FIGURE 8.5
FIGURE 8.6 FIGURE 8.7 FIGURE 8.8 FIGURE 8.9 FIGURE 8.10 FIGURE 8.11 FIGURE 9.1 FIGURE 9.1A FIGURE 10.1 FIGURE 10.2 FIGURE 10.3 FIGURE 10.4 FIGURE 10.5 FIGURE 10.6 FIGURE 10.7 FIGURE 10.8 FIGURE 10.9 FIGURE 10.10 FIGURE 10.11 FIGURE 10.12 FIGURE 10.13 FIGURE 10B.1 FIGURE 10C.1 FIGURE 10C.2 FIGURE 10C.3 FIGURE 10C.4 FIGURE 10C.5 FIGURE 11.1 FIGURE 11.2A FIGURE 11.2B FIGURE 11.2C FIGURE 12.1 FIGURE 12.2 FIGURE 13.1 FIGURE 13.2A FIGURE 13.2B FIGURE 13.3A FIGURE 13.3B FIGURE 13.4A FIGURE 13.4B FIGURE 14.1 FIGURE 14.2 FIGURE 14.3 FIGURE 15.1 FIGURE 15.2 FIGURE 15.3 FIGURE 16.1A FIGURE 16.1B FIGURE 16.1C FIGURE 16.2 FIGURE 16A.1